Identifying key factors affecting of the projects objectives in Baghdad Province by using experts interview technique | ||
Anbar Journal of Engineering Sciences | ||
Article 7, Volume 13, Issue 1, May 2022, Pages 59-64 PDF (711.67 K) | ||
Document Type: Research Paper | ||
DOI: 10.37649/aengs.2022.175881 | ||
Author | ||
Halah waleed abd Al-jaleel* | ||
Department of Information Technology, Biulding Directorate, Baghdad, Iraq | ||
Abstract | ||
The performance of the construction industry is regarded as one of the most significant variables in the global economic development success of nations. As a result, it requires focusing on strengths to enhance them and weaknesses to address them. This study aims to identify the key factors affecting the objectives of construction projects. To achieve the study aim, previous records and documents of two completed projects were studied carefully to identify problems that occurred and the impact of these problems on the project objectives. After that, an experts' interview was conducted to identify the key factors affecting the purposes of the construction project. The results of this study identified (33) key factors affecting the achievement of the construction project objectives, where the factor "The financial allocation for the project" was the most important, while the factor "Bad a health and safety plan in the project" was the least important. | ||
Keywords | ||
Construction Projects; objectives; key factors; experts' inter-view | ||
References | ||
[1] Tayeh B.A., Kh. Al-Hallaq KH, and Sabha F.A. (2016). Effects of faulty design phase on school buildings maintenance in gaza strip, Americ. J. Civ. Eng. Arch., 4: 199-210. [https://doi.org/10.12691/ajcea-4-6-2].
[2] Lambropoulos S. (2013). Objective Construction Contract Award using Cost, Time and Durability Utility, Procedia - Social and Behavioral Sciences, 74: 123 – 133.
[3] Mali L. and Warudkar A.A. (2016). Causes of Delay in the Construction Industry in Pune Region of India, International Journal of Application or Innovation in Engineering & Management, 5(5): 306-313.
[4] Syedsalehi H. (2010). Strategic Planning Lecture, Electronic Branch, Islamic Azad University, Tehran.
[5] El-Sheikh A. and Pryke D. (2010). Network gaps and project success, Construction Management and Economics, 28(12): 1205-1217.
[6] Phua F.T.T. (2004). Modelling the determinants of multi-firm project success: a grounded exploration of differing participant perspectives, Construction Management and Economics, 22(5): 451- 459.
[7] Tayeh O.A., El-Hallaq Kh., and Tayeh B.A. (2018). Importance of organizational culture for Gaza strip construction companies, Int. J. Eng. Manage. Res., 8: 35-39, 2018.
[8] El-Hallaq Kh. and Tayeh B.A. (2015). Strategic planning in construction companies in gaza strip, J. Eng. Res. Techno., 2: 167-174, 2015.
[9] Rumane A. R. (2011). Quality Management in Construction Projects, Taylor and Francis Group, LLC, Boca Raton London New York.
[10] Lester A. (2013). Project Management, Planning and Control: Managing Engineering, Construction and Manufacturing Projects to PMI, APM and BSI Standards, Sixth Edition. Butterworth-Heinemann.ISBN-13: 978-0080983240
[11] Fan M., Lin N., and Sheu C. (2008). Choosing a project risk-handling strategy: An analytical model, International Journal of Project Management, 112: 700–713.
[12] Gudienė N., Ramelytė L., and Banaitis A. (2013). An Evaluation of Critical Success Factors for Construction Projects using Expert Judgment, Proceedings in Scientific Conference. No. 1.
[13] Musarat M. A. and Ahad M. (2016). Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan, Journal of Construction Engineering and Project Management, 6: 1-6. 10.6106/JCEPM.2016.12.4.001.
[14] Saleh S. H. (2004). Developing Construction Materials Planning and Control System for Fast Track Delivery Projects, A thesis submitted to the college of engineering of the university of Baghdad for award of the degree of doctor in construction project management.
[15] Gannett Fleming G. (2009). Construction Project Management Handbook, U.S. Department of Transportation Washington.
[16] Tayeh B., Al-Hallaq Kh., Alaloul W., and Kuhail A. (2018). Factors Affecting the Success of Construction Projects in Gaza Strip, The Open Civil Engineering Journal, 12: 301-315. 10.2174/1874149501812010301. | ||
Statistics Article View: 1,079 PDF Download: 98 |