Al Badri, M. (2018). UTILIZING A PERMANENT-MAGNET ALTERNATOR WITH THE FULL CONVERTER IN WIND TURBINE INCREASES THE EFFICIENCY OF SUPPLYING AN ACTIVE AND REACTIVE POWER TO THE ELECTRICAL NETWORK. Alustath, 11(1), 10-21. doi: 10.30772/qjes.v11i1.517
Muhammad Al Badri. "UTILIZING A PERMANENT-MAGNET ALTERNATOR WITH THE FULL CONVERTER IN WIND TURBINE INCREASES THE EFFICIENCY OF SUPPLYING AN ACTIVE AND REACTIVE POWER TO THE ELECTRICAL NETWORK". Alustath, 11, 1, 2018, 10-21. doi: 10.30772/qjes.v11i1.517
Al Badri, M. (2018). 'UTILIZING A PERMANENT-MAGNET ALTERNATOR WITH THE FULL CONVERTER IN WIND TURBINE INCREASES THE EFFICIENCY OF SUPPLYING AN ACTIVE AND REACTIVE POWER TO THE ELECTRICAL NETWORK', Alustath, 11(1), pp. 10-21. doi: 10.30772/qjes.v11i1.517
Al Badri, M. UTILIZING A PERMANENT-MAGNET ALTERNATOR WITH THE FULL CONVERTER IN WIND TURBINE INCREASES THE EFFICIENCY OF SUPPLYING AN ACTIVE AND REACTIVE POWER TO THE ELECTRICAL NETWORK. Alustath, 2018; 11(1): 10-21. doi: 10.30772/qjes.v11i1.517


Journal Management System. Powered by ejournalplus.com