Noman Dawood, L., S.AL-zubaidy, S., Abbas Mahmoud, M. (2012). Use of Critical path method inmaintenance planning of an electric power station. Alustath, 30(8), 197-211. doi: 10.30684/etj.30.8.14
Laith Noman Dawood; sawsan S.AL-zubaidy; Mahmoud Abbas Mahmoud. "Use of Critical path method inmaintenance planning of an electric power station". Alustath, 30, 8, 2012, 197-211. doi: 10.30684/etj.30.8.14
Noman Dawood, L., S.AL-zubaidy, S., Abbas Mahmoud, M. (2012). 'Use of Critical path method inmaintenance planning of an electric power station', Alustath, 30(8), pp. 197-211. doi: 10.30684/etj.30.8.14
Noman Dawood, L., S.AL-zubaidy, S., Abbas Mahmoud, M. Use of Critical path method inmaintenance planning of an electric power station. Alustath, 2012; 30(8): 197-211. doi: 10.30684/etj.30.8.14


Journal Management System. Powered by ejournalplus.com