Using work factor method for operational models of disassembly and reassembly evaluation | ||
Al-Qadisiyah Journal for Engineering Sciences | ||
Volume 14, Issue 4, December 2021, Pages 214-219 PDF (368.51 K) | ||
Document Type: Research Paper | ||
DOI: 10.30772/qjes.v14i4.788 | ||
Author | ||
Jean Bosco SAMON* | ||
Laboratory of Mechanic, Material, and Photonic, Department of Mechanical Engineering, National School of Agro-Industrial Sciences, The University of Ngaoundere, P. O. Box 543 Ngaoundere-Cameroon | ||
Abstract | ||
The purpose of this paper is to study the disassembly task time in the maintenance and recycling context, knowing that only the reassembly task is needed in repairing operation. Dis/reassembly activities are delicate and need precise intervention due to the obligation of equipment refunctioning constraints. Time spent for dis/reassembling faulty components should be well-deducted and standardized. It is not always the case due to the various variant disassembly metrics and contexts. The Work Factor Method during dis/reassembly activities helps to develop the operational dis/reassembly time models. These models contribute to defining effective Time as far as operational dis/re-assembly activity is concerned and can help to optimize maintenance and recycling task planning. | ||
Keywords | ||
Dis/re-assemblability; Dis/reassembly sequencing; Modeling; Maintenance; Recycling; Operational context | ||
Statistics Article View: 58 PDF Download: 38 |