Ibrahim, M., Al-kazzaz, D. (2021). Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study. Alustath, 26(1), 1-18. doi: 10.33899/rengj.2021.128695.1068
Mwafaq Yousif Ibrahim; Dhuha Abdulgani Al-kazzaz. "Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study". Alustath, 26, 1, 2021, 1-18. doi: 10.33899/rengj.2021.128695.1068
Ibrahim, M., Al-kazzaz, D. (2021). 'Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study', Alustath, 26(1), pp. 1-18. doi: 10.33899/rengj.2021.128695.1068
Ibrahim, M., Al-kazzaz, D. Utilizing BIM 4D in Improving Project Execution Scheduling A Realistic Project for the Mosul Municipality as a Case Study. Alustath, 2021; 26(1): 1-18. doi: 10.33899/rengj.2021.128695.1068


Journal Management System. Powered by ejournalplus.com