Saiwan Shamkhi, M. (2016). VERVICATION OF PROCESS DESIGN OF AN EXTENDED AERATION FOR AL-SHURQAT WASTEWATER TREATMENT PLANT. Alustath, 20(1), 48-58.
Mohammed Saiwan Shamkhi. "VERVICATION OF PROCESS DESIGN OF AN EXTENDED AERATION FOR AL-SHURQAT WASTEWATER TREATMENT PLANT". Alustath, 20, 1, 2016, 48-58.
Saiwan Shamkhi, M. (2016). 'VERVICATION OF PROCESS DESIGN OF AN EXTENDED AERATION FOR AL-SHURQAT WASTEWATER TREATMENT PLANT', Alustath, 20(1), pp. 48-58.
Saiwan Shamkhi, M. VERVICATION OF PROCESS DESIGN OF AN EXTENDED AERATION FOR AL-SHURQAT WASTEWATER TREATMENT PLANT. Alustath, 2016; 20(1): 48-58.


Journal Management System. Powered by ejournalplus.com