S. Abd Ali, R., A. khaleel, T., H. Ameen, S. (2016). Design a System to Estimate the Road Construction Project Preliminary Equipment Requirements in the Design Stage. Alustath, 34(13A), 554-565. doi: 10.30684/etj.34.13A.20
Raid S. Abd Ali; Tareq A. khaleel; Shealan H. Ameen. "Design a System to Estimate the Road Construction Project Preliminary Equipment Requirements in the Design Stage". Alustath, 34, 13A, 2016, 554-565. doi: 10.30684/etj.34.13A.20
S. Abd Ali, R., A. khaleel, T., H. Ameen, S. (2016). 'Design a System to Estimate the Road Construction Project Preliminary Equipment Requirements in the Design Stage', Alustath, 34(13A), pp. 554-565. doi: 10.30684/etj.34.13A.20
S. Abd Ali, R., A. khaleel, T., H. Ameen, S. Design a System to Estimate the Road Construction Project Preliminary Equipment Requirements in the Design Stage. Alustath, 2016; 34(13A): 554-565. doi: 10.30684/etj.34.13A.20


Journal Management System. Powered by ejournalplus.com